Home Works Power Generation
Print E-mail

 

Power Generation

Rigorous planning, multi-disciplinary personnel, time schedule precision, stringent safety and quality control are the ever-present challenges in power generation works. The expertise acquired by CESBE over the last 20 years – ranging from small dams to the most impressive hydroelectric plant – is a guarantee of success for future projects.


 

“ITAQUI” PORT THERMAL ELECTRIC POWER PLANT (in progress)

Main civil works for a coal thermal electric power plant.

- Power: 360 MW
- Structural concrete: 36,672 m³
- Concrete paving: 7,561 m³
- Inserts: 180 ton

Locality: São Luis – Maranhão

Owner: MABE Construção e Administração de Projetos Ltda

 

“PAIOL” DAM

Complete civil works for the “Paiol” Dam, a small hydroelectric power plant, located on “Suaçuí Grande” River.

- Power: 20 MW
- Earth-fill Dam: 65,000 m³
- Soil excavation: 91,829 m³
- Rock excavation: 120,405 m³
- Structural concrete: 24,949 m³

Locality: Frei Inocêncio e Mathias Lobato - Minas Gerais

Owner: Paiol Energia S.A. (ERSA - Energias Renováveis)

 

“ARVOREDO” DAM

Complete civil works for the “Arvoredo” Dam, a small hydroelectric power plant, located on “Irani” River.

- Power: 13.5 MW
- Rolled compacted concrete dam: 53,000 m³
- Soil and rock excavation: 237,000 m³
- Structural concrete: 28,800 m³

Locality: "Irani" River - Santa Catarina

Owner: SPE Arvoredo Energia S.A.

 


“BARRA DO BRAÚNA” DAM

EPC / Turnkey Lump Sum contract for construction of “Barra do Braúna” Dam, a hydroelectric power plant, located on “Pomba” River.

- Power: 39 MW
- Earth-fill dam and riprap: 500,000 m³
- Soil and rock excavation: 618,000 m³
- Structural concrete: 45,000 m³

Locality: Recreio - Minas Gerais

Owner: Barra do Braúna Energética S.A.

 

“SANTA FÉ” DAM

EPC contracto for construction of “Santa Fé” Dam, a small thermo electric power plant, located on “Itapemirim” River.

- Power: 29.6 MW
- Structural concrete: 32,000 m³
- Rock excavation: 705,500 m³
- Underground rock excavation: 84,700 m³
- Soil excavation: 280,000 m³

Locality: "Itapemirim" River – Alegre - Espírito Santo

Owner: Santa Fé Energia S.A. – Energias do Brasil

 

“CAÇU” AND “COQUEIROS” ENERGY COMPLEX

Complete civil works for the construction of two hydroelectric power plants in “Goiás”, State of  Brazil. With a total power of 155 MW, “Caçu” has 65 MW and “Coqueiros” has 90 MW, this complex could provide energy for more than 500,000 inhabitants. Consortium: Cesbe and Toniolo Busnello.
 

Locality: Caçu e Cachoeira Alta - Goiás

Owner: Gerdau Aços Longos S.A.

 

THERMAL ELECTRIC POWER PLANT FOR THYSSENKRUPP CSA

The ThyssenKrupp CSA are building a new steel mill in Sepetiba Bay in the state of Rio de Janeiro in Brazil. The mill will have an annual capacity of five million tons of steel and will commence production in summer 2010. We did the civil works for the Thermal Electric Power Plant that will provide energy for the complex.

- Power:  490 MW
- Structural concrete: 24,412.13 m³
- Jet Grouting columns Ø 140 cm: 10,191 m
- Inserts: 105 ton

 

Locality: Sepetiba - Rio de Janeiro

Owner: Alstom Brasil Energia e Transporte Ltda

 

USIMINAS THERMAL ELECTRIC POWER PLANT

Main civil works for the thermal electric power plant (unit 02) for Usiminas “Intendente Câmara” Plant.

- Structural concrete: 5,041 m³
- Inserts: 18.23 ton
 

Locality: Ipatinga - Minas Gerais

Owner: CONSTRUÇÕES E COMÉRCIO CAMARGO CORRÊA S.A.

 

DA ILHA DAM

This EPC / turnkey contract also profited from the small dams proximity - Da Ilha and  Jararaca - by allowing simultaneous construction with a unified management which greatly reduced costs.
- Rolled compacted concrete dam: 50,000 m³
- Rock excavated tunnel: 2,070 m long with 50.4 m² cross section
- Power: 26 MW
- Soil and rock excavation: 158,000 m³
- Structural concrete: 19,700 m³
 

Locality: "da Prata" River - Rio Grande do Sul

Owner: DA ILHA ENERGÉTICA S.A.

 

JARARACA DAM

Turnkey project located on "da Prata" River – RS.

- Rolled compacted concrete dam: 40,000 m³
- Rock excavated tunnel: 1,110 m long with 50.4 m² cross section
- Power: 28 MW
- Soil and rock excavation: 201,000 m³
- Structural concrete: 19,300 m³
 

Locality: "da Prata" River - Rio Grande do Sul

Owner: VÊNETO ENERGÉTICA S.A.

 

ALTO IRANI DAM

Turnkey project located on "Irani" River.
-Clay core rock fill dam: 362,000 m³
-Rock excavated tunnel: 1,830 m long with 22.4 m² cross section
-Power: 21 MW
-Soil and rock excavation: 660,000 m³
-Structural concrete: 13,900 m³
 

Locality: "Irani" River - Santa Catarina

Owner: SPE Alto Irani Energia S.A.

 

PLANO ALTO DAM

The proximity of the small dams - Plano Alto and Alto Irani – allowed this turnkey project to be simultaneously constructed by a unified staff with noteworthy cost reduction.
- Rolled compacted concrete dam: 42,000 m³
- Rock excavated tunnel: 230 m long with 16 m² cross section
- Power: 16.2 MW
- Soil and rock excavation: 165,000 m³
- Structural concrete: 14,500 m³
 

Locality: "Irani" River - Santa Catarina

Owner: SPE Plano Alto Energia S.A.

 

BURITI DAM

Turnkey project located on "Sucuriú" River.
- Clay core rock fill dam - CCR.
- Power: 30 MW
- Soil and rock excavation: 350,000 m³
- Structural concrete: 21,500 m³
 

Locality: "Sucuriú" River - Mato Grosso do Sul

Owner: Pouso Alto Energia LTDA

 

CARLOS GONZATTO DAM

Complete civil works for the Carlos Gonzatto Dam, with 9 MW of total power capacity. The owner is Campo Novo Energia S.A. (a company of CESBE´s Group).
 

Locality: "Turvo" River - Rio Grande do Sul

Owner: CN Energia S.A.

 

PARANATINGA DAM

Turnkey project located on "Coluene" River.

- Clay core rock fill dam - 351,000 m³
- Power: 30 MW
- Soil and rock excavation: 580,000 m³
- Structural concrete: 32,000 m³
 

Locality: "Coluene" River - Mato Grosso

Owner: Paranatinga Energia LTDA

 

AÇU THERMAL ELECTRIC POWER PLANT

Phase one civil works: construction of two power islands for equipment bases; foundations for steel tanks; and underground concrete channel.
- Power: 340 MW
- Structural concrete: 10,500 m³
 

Locality: Açu - Rio Grande do Norte

Owner:  Petróleo Brasileiro S.A. - Petrobras

 

PIRATININGA THERMAL ELECTRIC POWER PLANT

Civil works construction including Management, Operations and Maintenance Buildings.
- Power: 400 MW
- Structural concrete: 17, 000 m³
- Electric envelope / pipeline: 265 ton
- Inserts: 295 ton
 

Locality: São Paulo – Capital

Owner: Petróleo Brasileiro S.A. - Petrobras

 

ITAIPU POWER PLANT

CESBE was the leading company responsible for the installation of the last two Itaipu’s power units. The Consortium executed the services with the power plant in operation.
- Power supplied by the two units: 1,400 MW
- Structural concrete: 50,000 m³
 

Locality: "Paraná" River – Paraná | Border Brasil – Paraguai

Owner: Itaipu Binacional

 

“URUGUAIANA” THERMAL ELECTRIC POWER PLANT

Some civil works for “Uruguaiana” thermal electric power plant (gas), including underground systems, tanks and dikes.

- Power: 639 MW
 

Locality: Uruguaiana – Rio Grande do Sul

Owner: AES/SIEMENS-WESTING-HOUSE/PROMON

 

SEGREDO POWER PLANT

River Deviation: Cesbe participated in the Construction of three tunnels - cross section: 163 m² - for the deviation of the Iguaçu River. Total length: 2.115,355 m. Main Works: Excavations in soil and rock for structures; Rock fill dam with concrete face-height; Concrete structures for Spilway, Water intake, Penstock and Power House. Installed power: 1.260 MW.
Summary of quantities:
Rockfill: 5, 800, 000 m³
Rock excavation: 7, 300, 000 m³
Reinforced concrete: 300, 000 m³
Reinforcement bars: 27, 000 t
Steel structures, stel pipes and fittings: 745, 000 t
 

Locality: "Iguaçu" River - Paraná

Owner: Companhia Paranaense de Energia - Copel

 
Copyright © 2010 CESBE S.A. Engenharia e Empreendimentos. All Rights Reserved.
Joomla! is Free Software released under the GNU/GPL License.
 