Construction and infrastructure services for the Internal Railway Branch Line of Klabin’s new pulp production line, located in the City of Ortigueira, Paraná, part of the PUMA project. This work was carried out under a global price contract.
The total length of the line is of 5,100 meters, with 96 meters in covered area for loading, with the line seated in the floor of reinforced concrete. The rails used were the TR-60 standard and the extension has six Railroad Switchunits.

0m³
Earthmoving
0
Concrete Sleepers
0m
Line Extension