The City Hall of Florianópolis hired Cesbe in 1998 for the construction of the “Elevado do CIC”, two pre-stressed viaducts, 120 m each. Two years later, in a new contract, Cesbe carried out the works of the Rita Maria Highway Complex for the Florianopolis City Hall, two viaducts with infrastructure in metal piles and superstructure in caisson with 2 wells, in reinforced pre-stressed concrete, one 230 and the other 256 m long.
In both the works, new marginal tracks and cover leaves were built, including earthworks, drainage, paving, signaling and illumination of the roads.
Elevado CIC: two viaducts with
0m
of extension eachElevado Rita Maria: a viaduct with
0m
of extensionElevado Rita Maria :a viaduct with
0m
of extensionget to know our works

Press Room
CESBE ENGINEERS SHARE THEIR PROFESSIONAL EXPERIENCE AND RESILIENCE
11/08/2021Cesbe engineers share their professional experience and resilence. We at Cesbe are committed to encouraging and inspiring more women to follow the path of engineering and make a difference in the world with their technical and professional capabilities. ... +
Press Release
OPERATIONS DIRECTOR COMMENTS HOW CESBE IS PREPARING FOR THE SECTOR’S CHALLENGES
11/08/2021In recent years, the engineering sector has undergone a profound transformation, becoming increasingly dynamic and interactive. In this context, an assertive understanding of the sector is a decisive factor for construction companies in the search for improvements ... +
Press Release
CESBE IS TOP 10 AMONG THE LARGEST CONSTRUCTION COMPANIES IN BRAZIL IN THE 2021 ENGINEERING RANKING
11/08/2021In the 2021 Engineering Ranking, promoted annually by Revista O Empreiteiro, Cesbe is among the 10 largest construction companies in Brazil, proudly representing Paraná in the ranking of the 25 largest national companies. ... +
Press Release